main page  dealers press news profile our product

download

2nd hand

EGE 23  

Length Overall ................................7,00 m.
Length of Waterline .......................6,10 m.
Beam ...............................................2,50 m.
Beam WL ........................................1,92 m.
Displacement ...............................1250 kg.
Draft ..................................................0.95 m.
Ballast ..............................................350 kg.
Headroom ......................................1.55 m.
Berths ...................................................2
Recommended Engine
(outboard)................................. 8 or 9.9 hp.
Sail Area ............................................22 m2.
Main Sail ......................................10.25 m2.
Furling Genoa .............................11.48 m2.


CONSTRUCTION :

Hull : Hand made solid laminate fibreglass mat and rowing .

Deck : Deck is moulded fibreglass, stress areas where winches,

sheet tracks, etc. are reinforced by using backing chrome plates.

Ballast : 350 kg. cast iron, torpedo shaped bottom. Keel bolts are of stainless steel.

Rudder : Glass fibre rudder with tiller (mahogany and ashtree laminated)

Interior joinery : Marine grade water proof plywood faced with selected mahogany is used in all bulkheads and GRP used in all berths. All main bulkheads bonded to hull and deck using glass mat and polyester. Ceiling, top sides and visible hull sides builded with GRP. Hull sides, bottom, bilge, etc, topcoated throughout the interior. Varnished cabin sole, mahogany inlaid wood stripes.

ACCOMODATION :

Forward : Double berth , stowage and toilet under the berth

Middle : Settee on both sides. Table with fixed middle section.

Stowage behind and under the settee on both sides.

Toilet Compartment : It's built as a separate compartment . fibreglass unit with Sink.

Galley : Galley is on the opposite side of the toilet compartment with sink and

one burner gas stove. 70 l. water tank.

DECK EQUIPMENT :

-1 hatch, 2 fixed portlight 20x40.

-3 x 6A Harken winches. One organiser with 2 sheaves and double rope clutch.

-2 aluminium genoa tracks with rails.

-1 main sheet track with slider and tag lines.

-Navigation lights.

-25 mm. diameter stainless steel pullpit, pushpit and ladder.

General ; Bolts, nuts, washers and screws used for fastening deck equipment are of stainless steel. Sealing used between deck and equipment is polyurethane, silicone or specially developed material.

INTERIOR EQUIPMENT :

Fresh water system : 80 lt. capacity tank. Filler line from deck. Sink drained to the sea.

Toilet installation : Hand operated marine toilet with sea water in take and outlet through ball valves.

Cushions : Cushions in high quality foam with first class upholstery in choice of colours.

Electrical installation : Switchboard and control panel in navigators area. One light in main cabin and one light in the toilet compartment.

Gas system : 1 small gas bottle (4.95 litres)

MAST AND RIGGING :

Main mast : 7.5 m. long mast with one level of spreaders, boom and Genoa furler with wind indicator.

Standing rigging : All stays and shrouds in stainless steel wire.

Running rigging : 1 main halyard, 1 Genoa halyard, 1 main sheet, 2 Genoa sheets.

Sails : 1 main , 1 Genoa furler , sail bags.



 
cheap jordans|wholesale air max|wholesale jordans|wholesale jewelry